GOES Wireline 5 years Anniversary

5 Years Anniversary for our Slickline/Wireline department

5 Years anniversary with 75 GOES SLICKLINE / WIRELINE UNITS IN THE FIELD
The GOES Wireline Team is looking back on a successful and diversified year: Besides numerous unit deliveries and services done, we launched our own measuring system with 2 types of measuring heads: GM 16 and GM 20 as well as the GO-HMS Winchman’s panel.

Also our fully hashtagelectric hashtagwinch drive system is continuously writing its success story and has been implemented in various units all over the world.

Moreover, hashtagGOES hashtagWireline celebrated this year its 5th anniversary with 75 GOES hashtagSlickline/ hashtagWireline Units in the field!

We would like, therefore, to thank all our customers for their trust and the fruitful cooperation within these 5 years and we are looking forward for more years to come and plenty new units to be delivered.

Stayed tuned about our new developments and product launches next year – we planned some innovations for you!
For more information related to the Wireline units, please visit the following page:

Wireline Units

GOES GMBH

Muenchener Strasse 32
29392 Wesendorf
Germany +49 5376 97647 – 0
+49 5376 97647 – 90
www.goes-well.com
info[at]goes-well.com

KATT GMBH

Vorbruch 6
29227 Celle
Germany +49 5141 9895 – 0
+49 5141 9895 – 60
www.katt-gmbh.com
info[at]katt-gmbh.com

Copyright © GOES GmbH 2021

Wireline Mast Refurbishment made in Europe

Wireline mast refurbisment

WIRELINE MAST REFURBISHMENT

During the last weeks, our team in Celle made a major overhaul and recertification of an Elmar 80 ft #wireline Mast.
These major overhaul included following main steps:
 
–  Disassembly of the entire mast and substructure
–  Sandblasting of the main components
–  Nondestructive welding inspection
–  Welding repairs, where required
–  #Offshore frame overload lifting test, witnessed by third party
–  Coating
–  Assembly
–  Replacement of all hydraulic hoses and damaged components
–  Replacement of ropes, sheaves, lifting set and guy wires plus tirfors
–  Mast and #winch overload tests witnessed by third party
–  Third party certificate for Offshore Containers according ISO 10855
–  Third party certificate of test and thorough examination of Lifting Appliances
 
Last week the Wireline Mast was transported to our Client, InWaTec Combined B.V. in Emmen. On Wednesday, our training team taught 16 operators from InWaTec B.V. to operate this mast.
 
Thanks a lot to #InWaTec B.V. for this project, and we wish always safe jobs with this beauty!

#wireline #oilandgas #oilandgasindustry #oilfield #oilfieldservices

For more information related to the Wireline units, please visit the following page:

Wireline Units

Copyright © GOES GmbH 2021

Wireline Units

Service Week for our Wireline shop

Week 3 was “Service week” in our wireline shop.

In week three, our wireline team in Celle had a lot to do with four “old friends”. Following jobs were done:

– Immediate repairs
– General 10.000 operating hours overhaul
– Winch panel repair incl. technical data acquisition update
– Pressure control panel re-certification and technical update

It was a pleasure for us to work for our long term wireline clients.

For more information related to the Wireline units, please visit the following page:

Wireline Units

Copyright © GOES GmbH 2021

Pressure_measurement_wireline_unit_GOES

Wireline Unit delivered to a client in Germany

WIRELINE UNIT DELIVERED
In the end of November, our Wireline team from Celle finished a 6.0M Wireline Truck for “Schulze Druckmessungen” in Germany.
FEATURES
  • Single drum Wireline winch
  • High performance closed loop hydraulic drive
  • Straight line counterhead
  • Digital winch operator panel
  • Surface logging equipment 19” computer rack
  • Center tool rack for
  • Grease injection pump
  • Stuffing box pump
  • 12 kVA integrated hydraulic driven generator
  • Air Condition
  • Rig energy supply connection
  • Chassis: MAN TGL 12.250 (12 tons mgw, 250 hp)
The main purpose of the unit will be cased hole wireline service with single conductor cable for high definition down hole pressure measurements mainly in Western Europe.
The final acceptance test was performed at one test well near Celle, in Germany.
The unit is designed for cable jobs up to 1/4 in cable and is driven by a closed loop hydraulic drive via the truck engine power take off.
To see the video, please check it on our Youtube channel:
Wireline Unit designed for Pressure Measurements

Copyright © GOES GmbH 2021