Wireline Unit delivered to a client in Germany
WIRELINE UNIT DELIVERED
In the end of November, our Wireline team from Celle finished a 6.0M Wireline Truck for “Schulze Druckmessungen” in Germany.
FEATURES
Single drum Wireline winch
High performance closed loop hydraulic drive
Straight line counterhead
Digital winch operator panel
Surface logging equipment 19” computer rack
Center tool rack for
Grease injection pump
Stuffing box pump
12 kVA integrated hydraulic driven generator
Air Condition
Rig energy supply connection
Chassis: MAN TGL 12.250 (12 tons mgw, 250 hp)
The main purpose of the unit will be cased hole wireline service with single conductor cable for high definition down hole pressure measurements mainly in Western Europe.
The final acceptance test was performed at one test well near Celle, in Germany.
The unit is designed for cable jobs up to 1/4 in cable and is driven by a closed loop hydraulic drive via the truck engine power take off.
To see the video, please check it on our Youtube channel:
Wireline Unit designed for Pressure Measurements
GOES GMBH
Muenchener Strasse 32
29392 Wesendorf
Germany +49 5376 97647 – 0
+49 5376 97647 – 90
www.goes-well.com
info[at]goes-well.com
KATT GMBH
Vorbruch 6
29227 Celle
Germany +49 5141 9895 – 0
+49 5141 9895 – 60
www.katt-gmbh.com
info[at]katt-gmbh.com
Copyright © GOES GmbH 2021