WIRELINE UNIT DELIVERED
In the end of November, our Wireline team from Celle finished a 6.0M Wireline Truck for “Schulze Druckmessungen” in Germany.
FEATURES
  • Single drum Wireline winch
  • High performance closed loop hydraulic drive
  • Straight line counterhead
  • Digital winch operator panel
  • Surface logging equipment 19” computer rack
  • Center tool rack for
  • Grease injection pump
  • Stuffing box pump
  • 12 kVA integrated hydraulic driven generator
  • Air Condition
  • Rig energy supply connection
  • Chassis: MAN TGL 12.250 (12 tons mgw, 250 hp)
The main purpose of the unit will be cased hole wireline service with single conductor cable for high definition down hole pressure measurements mainly in Western Europe.
The final acceptance test was performed at one test well near Celle, in Germany.
The unit is designed for cable jobs up to 1/4 in cable and is driven by a closed loop hydraulic drive via the truck engine power take off.
To see the video, please check it on our Youtube channel:
Wireline Unit designed for Pressure Measurements

GOES GMBH

Muenchener Strasse 32
29392 Wesendorf
Germany +49 5376 97647 – 0
+49 5376 97647 – 90
www.goes-well.com
info[at]goes-well.com

KATT GMBH

Vorbruch 6
29227 Celle
Germany +49 5141 9895 – 0
+49 5141 9895 – 60
www.katt-gmbh.com
info[at]katt-gmbh.com

Copyright © GOES GmbH 2021