Logging Truck Delivery to Poland

LOGGING TRUCK DELIVERY TO POLAND
Today, our Client Gas Storage Poland picked up their new truck from our Wireline base in Celle.

The Truck is built on a modern MAN Euro 6e chassis with 6×4 drive.

The purpose of the 6.5M Logging Truck unit will be wireline service and geological measurements with multi conductor cable for high definition down hole measurements in gas storage caverns. The unit is designed for cable jobs up to 17/32 inch cable and is driven by a closed loop hydraulic drive via the truck engine power take off.

Details of the unit are:

  • Single drum Wireline Logging winch
  • High performance closed loop hydraulic drive with two-speed gearbox
  • Straight line counterhead
  • Digital winch operator panel
  • Tool racks
  • Integrated hydraulic driven generator
  • Air Condition
  • Rig energy supply connection
  • Chassis: Heavy duty MAN TGX 33.430 chassis with long and high cab (26 tons MGW, 430 hp)
 

We wish our client always safe and successful jobs. Thanks a lot for your trust.

For more information related to the Wireline units, please visit the following page:

Wireline Units

GOES GMBH

Muenchener Strasse 32
29392 Wesendorf
Germany +49 5376 97647 – 0
+49 5376 97647 – 90
www.goes-well.com
info[at]goes-well.com

KATT GMBH

Vorbruch 6
29227 Celle
Germany +49 5141 9895 – 0
+49 5141 9895 – 60
www.katt-gmbh.com
info[at]katt-gmbh.com

Copyright © GOES GmbH 2021

Wireline Units

Service Week for our Wireline shop

Week 3 was “Service week” in our wireline shop.

In week three, our wireline team in Celle had a lot to do with four “old friends”. Following jobs were done:

– Immediate repairs
– General 10.000 operating hours overhaul
– Winch panel repair incl. technical data acquisition update
– Pressure control panel re-certification and technical update

It was a pleasure for us to work for our long term wireline clients.

For more information related to the Wireline units, please visit the following page:

Wireline Units

Copyright © GOES GmbH 2021

Wireline and Capillary Combination set

Wireline and Capillary Combination set delivered to InWaTec

Wireline and Capillary Combination set delivered to InWaTec
Last week, on Friday, our Wireline Team in Celle handed over a brand new Wireline and Capillary Combination set to our Client, InWaTec B.V. from Emmen.
The set is built according CE ATEx Directive 2014/34/EU for use in ATEx Zone 2.
It can be used as a simple slickline unit or as a complete capillary set. It consists of:
  • Dual Lift Slickline / Wireline Offshore Unit (Offshore Container design with Lloyd’s Register certification) with Powerpack Container and Winch+Operator Container
  • 20K Capillary Injector
  • Reel and Control skid (Injector control and injector hose connections)
  • Capillary spooler skid to accommodate the capillary drum
  • Accumulator skid to run a four ram BOP (not shown in the picture)
  • 4 NEXUS Pressure Control Equipment (Stripper + BOP; not shown in the picture)
As always we wish InWaTec B.V. much success and safe jobs with the equipment.
More technical details will follow during the next days

For more information related to this Wireline unit, please visit the following page:

Coming soon

Copyright © GOES GmbH 2021

Wireline Logging Unit

Wireline Logging Truck Unit delivered to Poland!

WIRELINE HYBRID TRUCK UNIT
Today, GOES’ 35th Unit built by our Wireline Team from Celle, has left the yard!
That was already the second delivery in 2022!
The Wireline Logging Truck was built for Geofizyka Torun S.A. in Poland. Good Luck for our customer.
More technical details will follow during the next days.

For more information related to this type of Wireline unit, please visit the following page:

Land Units

Copyright © GOES GmbH 2021