GOES_Single_Acid_Pump_Trailer

Single Acid Pump Unit trailer mounted

Single Acid Pump, Trailer mounted

Within the last month deliveries, this Single Acid Pump Unit, trailer mounted, also found its way to the client.

It has a simple and efficient design, and as main components we have used :
hashtagCAT 15 Engine, 595HP@2100 RPM
hashtagAllison 4700 OFS tranmission
hashtagGD Compact 600 Triplex Pump (2,75″ plunger size)

hashtagfluid hashtagpump hashtagacid hashtagwellintervention hashtagoilandgas hashtagoilandgasindustry hashtagoilfieldservices hashtagoilfieldservices hashtagoilfield

For more information related to the Single Pump units, please visit the following page:

Fluid Pumping Units

GOES GMBH

Muenchener Strasse 32
29392 Wesendorf
Germany +49 5376 97647 – 0
+49 5376 97647 – 90
www.goes-well.com
info[at]goes-well.com

KATT GMBH

Vorbruch 6
29227 Celle
Germany +49 5141 9895 – 0
+49 5141 9895 – 60
www.katt-gmbh.com
info[at]katt-gmbh.com

Copyright © GOES GmbH 2021

GOES_Nitrogen_Pump_Skid

N2 180k Pumping Unit

Nitrogen 180K Pumping Unit Skid mounted

Last month we have delivered a N2 180k Pumping Unit, Skid Mounted, with operator’s cabin integrated in the frame.

This unit has as main components :

– CAT C-15, 540HP@2100 RPM engine
– ACD LN2 Triplex PUMP 1.625″ x 1.5″
– ACD LN2 Boost pump 1.5″x 2.5″ x 6″


hashtagnitrogen hashtagN2 hashtagPump hashtagskid hashtagoilandgasindustry hashtagoilfield hashtagoilandgas hashtagoilfieldservices hashtagwellintervention

For more information related to the Nitogen Pumping units, please visit the following page:

Nitrogen Pumping Units

Copyright © GOES GmbH 2021

GOES Wireline 5 years Anniversary

5 Years Anniversary for our Slickline/Wireline department

5 Years anniversary with 75 GOES SLICKLINE / WIRELINE UNITS IN THE FIELD
The GOES Wireline Team is looking back on a successful and diversified year: Besides numerous unit deliveries and services done, we launched our own measuring system with 2 types of measuring heads: GM 16 and GM 20 as well as the GO-HMS Winchman’s panel.

Also our fully hashtagelectric hashtagwinch drive system is continuously writing its success story and has been implemented in various units all over the world.

Moreover, hashtagGOES hashtagWireline celebrated this year its 5th anniversary with 75 GOES hashtagSlickline/ hashtagWireline Units in the field!

We would like, therefore, to thank all our customers for their trust and the fruitful cooperation within these 5 years and we are looking forward for more years to come and plenty new units to be delivered.

Stayed tuned about our new developments and product launches next year – we planned some innovations for you!
For more information related to the Wireline units, please visit the following page:

Wireline Units

Copyright © GOES GmbH 2021

Twin Cementing Pumping Unit – Trailer mounted

TWIN CEMENTING PUMPING UNIT - TRAILER MOUNTED - Delivered to Algeria

Last year at #ADIPEC we met a new customer from #North #Africa for the first time. Today, the Twin #Cementing #Pump Trailer Unit is on the way to the #Algerian #oilfields. We wish them luck and continuous jobs.
This Cementer is equipped with two C-15 engines, two #Allison 4700 transmissions and two #SPM TWS 600 pumps. The unit can be operated in automatic and manual mode.

For more information related to the Cementing Pumping Units, please visit the following page:

https://goes-well.com/oilfield-cementing-equipment
Twin cementing pump trailer

Copyright © GOES GmbH 2021

ELECTRIC-DRIVEN SLICKLINE UNITS FOR STORENGY

Electric-Driven Slickline units for Storengy

In July we delivered two electric-driven Slickline Units for our customer Storengy out of France.
These dual-drum Units are designed and manufactured to work with wires up to 0.160”.
The drums can carry more than 25.000 ft Slickline wire.
Our winch is driven by an electric high-performance system which can be powered by an onboard Caterpillar diesel generator or an external power supply (grid).
The spacious three section layout splits the unit into winch , operator and power pack areas. In the winch compartment  also a PCE storage and tool racks (add. tool rack in double floor) are installed. PCE Controls and a decent workshop are in the operator cabin.  
We appreciate the business and wish our client always safe and successful jobs.
For more information related to the Wireline units, please visit the following page:
https://goes-well.com/wireline-special-units/
Electric_driven_Slickline_Units_manufacturer_Storengy

Copyright © GOES GmbH 2021

Offshore Europe 2023 in Aberdeen

Offshore Europe 2023 in Aberdeen
It´s time to come together again!
We invite you to join us at Offshore Europe 2023 in Aberdeen, UK.
As an exhibitor, we look forward to meeting you at our stand 1X10A.
We are going to launch our latest innovation.
Feel free to meet us and to discuss your individual and specific equipment needs and requirements, or just say hello.

For a free access please print your own visitor badge : I want a free Visitor Badge

Copyright © GOES GmbH 2021

Slickline and Wireline Crane Units

Slickline and Wireline Crane unit
Slickline and Wireline Crane units for SOSCO – الصحاري Oman:
 
Two new #slickline and #wireline #crane units from our team in Celle were shipped to the beautiful country of #Oman.
Our customer, SOSCO – الصحاري, is using the units for Slickline and E-Line applications.
 
– Dual drum Slickline/Wireline winch
– High performance closed loop hydraulic drive
– 16” counterhead for up to 0.125 slickline wire and 1/4” braided line or monoconductor cable
– Turnable cabin
– Integrated #pressure #control #equipment control panel
– Digital winch #operator panel
– PCE test unit with chart recorder, pre-fill pump, 500 l stainless steel tank and 10K high pressure pump
– Manitex 101 ft telescope crane
– Chassis: #MAN TGS 33.360 (33 tons mgw, 360 hp)

For more information related to the Wireline units, please visit the following page:

Wireline Units

SOSCO Oman ordered Slickline and Wireline Units
To see the video, please check it on our Youtube channel:
Slickline and Wireline Crane Units

Copyright © GOES GmbH 2021

Wireline Mast Refurbishment made in Europe

Wireline mast refurbisment

WIRELINE MAST REFURBISHMENT

During the last weeks, our team in Celle made a major overhaul and recertification of an Elmar 80 ft #wireline Mast.
These major overhaul included following main steps:
 
–  Disassembly of the entire mast and substructure
–  Sandblasting of the main components
–  Nondestructive welding inspection
–  Welding repairs, where required
–  #Offshore frame overload lifting test, witnessed by third party
–  Coating
–  Assembly
–  Replacement of all hydraulic hoses and damaged components
–  Replacement of ropes, sheaves, lifting set and guy wires plus tirfors
–  Mast and #winch overload tests witnessed by third party
–  Third party certificate for Offshore Containers according ISO 10855
–  Third party certificate of test and thorough examination of Lifting Appliances
 
Last week the Wireline Mast was transported to our Client, InWaTec Combined B.V. in Emmen. On Wednesday, our training team taught 16 operators from InWaTec B.V. to operate this mast.
 
Thanks a lot to #InWaTec B.V. for this project, and we wish always safe jobs with this beauty!

#wireline #oilandgas #oilandgasindustry #oilfield #oilfieldservices

For more information related to the Wireline units, please visit the following page:

Wireline Units

Copyright © GOES GmbH 2021

Logging Truck Delivery to Poland

LOGGING TRUCK DELIVERY TO POLAND
Today, our Client Gas Storage Poland picked up their new truck from our Wireline base in Celle.

The Truck is built on a modern MAN Euro 6e chassis with 6×4 drive.

The purpose of the 6.5M Logging Truck unit will be wireline service and geological measurements with multi conductor cable for high definition down hole measurements in gas storage caverns. The unit is designed for cable jobs up to 17/32 inch cable and is driven by a closed loop hydraulic drive via the truck engine power take off.

Details of the unit are:

  • Single drum Wireline Logging winch
  • High performance closed loop hydraulic drive with two-speed gearbox
  • Straight line counterhead
  • Digital winch operator panel
  • Tool racks
  • Integrated hydraulic driven generator
  • Air Condition
  • Rig energy supply connection
  • Chassis: Heavy duty MAN TGX 33.430 chassis with long and high cab (26 tons MGW, 430 hp)
 

We wish our client always safe and successful jobs. Thanks a lot for your trust.

For more information related to the Wireline units, please visit the following page:

Wireline Units

Wireline Logging Truck Unit

Copyright © GOES GmbH 2021

Wireline Units

Service Week for our Wireline shop

Week 3 was “Service week” in our wireline shop.

In week three, our wireline team in Celle had a lot to do with four “old friends”. Following jobs were done:

– Immediate repairs
– General 10.000 operating hours overhaul
– Winch panel repair incl. technical data acquisition update
– Pressure control panel re-certification and technical update

It was a pleasure for us to work for our long term wireline clients.

For more information related to the Wireline units, please visit the following page:

Wireline Units

Copyright © GOES GmbH 2021