Wireline Mast Refurbishment made in Europe

Wireline mast refurbisment

WIRELINE MAST REFURBISHMENT

During the last weeks, our team in Celle made a major overhaul and recertification of an Elmar 80 ft #wireline Mast.
These major overhaul included following main steps:
 
–  Disassembly of the entire mast and substructure
–  Sandblasting of the main components
–  Nondestructive welding inspection
–  Welding repairs, where required
–  #Offshore frame overload lifting test, witnessed by third party
–  Coating
–  Assembly
–  Replacement of all hydraulic hoses and damaged components
–  Replacement of ropes, sheaves, lifting set and guy wires plus tirfors
–  Mast and #winch overload tests witnessed by third party
–  Third party certificate for Offshore Containers according ISO 10855
–  Third party certificate of test and thorough examination of Lifting Appliances
 
Last week the Wireline Mast was transported to our Client, InWaTec Combined B.V. in Emmen. On Wednesday, our training team taught 16 operators from InWaTec B.V. to operate this mast.
 
Thanks a lot to #InWaTec B.V. for this project, and we wish always safe jobs with this beauty!

#wireline #oilandgas #oilandgasindustry #oilfield #oilfieldservices

For more information related to the Wireline units, please visit the following page:

Wireline Units

GOES GMBH

Muenchener Strasse 32
29392 Wesendorf
Germany +49 5376 97647 – 0
+49 5376 97647 – 90
www.goes-well.com
info[at]goes-well.com

KATT GMBH

Vorbruch 6
29227 Celle
Germany +49 5141 9895 – 0
+49 5141 9895 – 60
www.katt-gmbh.com
info[at]katt-gmbh.com

Copyright © GOES GmbH 2021

Logging Truck Delivery to Poland

LOGGING TRUCK DELIVERY TO POLAND
Today, our Client Gas Storage Poland picked up their new truck from our Wireline base in Celle.

The Truck is built on a modern MAN Euro 6e chassis with 6×4 drive.

The purpose of the 6.5M Logging Truck unit will be wireline service and geological measurements with multi conductor cable for high definition down hole measurements in gas storage caverns. The unit is designed for cable jobs up to 17/32 inch cable and is driven by a closed loop hydraulic drive via the truck engine power take off.

Details of the unit are:

  • Single drum Wireline Logging winch
  • High performance closed loop hydraulic drive with two-speed gearbox
  • Straight line counterhead
  • Digital winch operator panel
  • Tool racks
  • Integrated hydraulic driven generator
  • Air Condition
  • Rig energy supply connection
  • Chassis: Heavy duty MAN TGX 33.430 chassis with long and high cab (26 tons MGW, 430 hp)
 

We wish our client always safe and successful jobs. Thanks a lot for your trust.

For more information related to the Wireline units, please visit the following page:

Wireline Units

Copyright © GOES GmbH 2021

Wireline Units

Service Week for our Wireline shop

Week 3 was “Service week” in our wireline shop.

In week three, our wireline team in Celle had a lot to do with four “old friends”. Following jobs were done:

– Immediate repairs
– General 10.000 operating hours overhaul
– Winch panel repair incl. technical data acquisition update
– Pressure control panel re-certification and technical update

It was a pleasure for us to work for our long term wireline clients.

For more information related to the Wireline units, please visit the following page:

Wireline Units

Copyright © GOES GmbH 2021

Wireline Logging Unit

Wireline Logging Truck Unit delivered to Poland!

WIRELINE HYBRID TRUCK UNIT
Today, GOES’ 35th Unit built by our Wireline Team from Celle, has left the yard!
That was already the second delivery in 2022!
The Wireline Logging Truck was built for Geofizyka Torun S.A. in Poland. Good Luck for our customer.
More technical details will follow during the next days.

For more information related to this type of Wireline unit, please visit the following page:

Land Units

Copyright © GOES GmbH 2021

Wireline_unit_truck_GOES

Wireline Logging Unit delivered

WIRELINE LOGGING UNIT DELIVERED

GOES WIRELINE LOGGING UNIT

Wireline Logging Unit mounted on Mercedes Actros started today its journey to Moscow´s NEFTEGAZ 2019 for being presented to our valued customers and all interested visitors!
The unit comes with a AM5K Benchmark measuring head, Stimline XOS controls and IDEX software. We will also present a Truck Mounted Frac Pump and a NEXUS BOP. We are looking forward to meeting you there!

Copyright © GOES GmbH 2021