Twin-Pump-Unit-Trailer-Mounted.jpg

Twin Pump Trailer Manufactured by GOES GmbH for NESR

TWIN PUMP TRAILER MANUFACTURED BY GOES FOR NESR

TWIN PUMPING UNIT

  • GOES GmbH delivered another two Twin Pump Trailers to our valued customer NESR in KSA.
  • The Units are equipped with Caterpillar C15 engines, Allison OFS 4700 Transmissions and SPM TWS 600S HD pumps.
  • In addition, the GOES DMS Data Acquisition System records real-time values from operations and creates easily job reports.
To see the video, please check it on our Youtube channel:
Twin pumping Unit – Video Presentation

GOES GMBH

Muenchener Strasse 32
29392 Wesendorf
Germany +49 5376 97647 – 0
+49 5376 97647 – 90
www.goes-well.com
info[at]goes-well.com

KATT GMBH

Vorbruch 6
29227 Celle
Germany +49 5141 9895 – 0
+49 5141 9895 – 60
www.katt-gmbh.com
info[at]katt-gmbh.com

Copyright © GOES GmbH 2021

Coiled_tubing_fleet_2_GOES

Coiled Tubing Unit – Package 2020

COILED TUBING UNIT - PACKAGE 2020

COILED TUBING EQUIPMENT

This week GOES is shipping a Coiled Tubing Package for a valued customer to Oman. The package consists of one Coiled Tubing Unit, one Twin Pump, one 180k N2 Unit, one Batch Mixer and one Yard Spooler.
The CTU is dressed for 2“ operations and comes with a Coil Solution 80k Injector and a NEXUS 4 1/16“ BOP. All main units are equipped with Prime DMS and are suitable for desert operations.

KATT GMBH

Vorbruch 6
29227 Celle
Germany +49 5141 9895 – 0
+49 5141 9895 – 60
www.katt-gmbh.com
info[at]katt-gmbh.com

Twin_acid_pumping_trailer_unit_2018_GOES

Twin Pumping Unit – Ready to go / Available for sale (UPDATE : SOLD)

TWIN PUMPING UNIT - READY TO GO / AVAILABLE FOR SALE (UPDATE : SOLD)

The Twin Pump Unit (trailed mounted), which is made for desert conditions (+55 deg C), is equipped with two C15 engines, two Allison 4700 transmissions and two SPM TWS600 pumps.
It comes also with a stainless steel displacement tank, Gardner Denver c-pumps, pipe and swivel racks, air conditioned operator cabin and GOES/Prime DMS (Data Acquisition System). The offering is subject to prior sale.
For more information (full technical specification, please contact us.

Copyright © GOES GmbH 2021

Twin_acid_pumping_trailer_unit_2017_GOES

Twin Pumping Units for National Petroleum Services (NPS)

GOES GMBH DELIVERS EQUIPMENT FOR TACROM SERVICES

Recently GOES delivered another Twin Pumping unit to its valued customer, National Petroleum Services (NPS). The unit comes with 2 C-15 engines, 2 Allison 4700 transmissions and 2 SPM TWS 600s HD pumps.
The unit is equipped with stainless steel displacement tanks and GOES DMS (our state-of-the-art Data Acquisition Software) for its work in Basra, Iraq. We also deliver two more DMS sets to upgrade 2 other NPS Twin Pumps.
We are glad to have NPS as a repeated customer. These sales are the best feedback when it comes to quality work and good after-sales service.
Twin_acid_pumping_trailer_unit_2017_GOES

Copyright © GOES GmbH 2021

Twin_acid_pumping_trailer_unit_2016_GOES

GOES GmbH delivers three Twin Acid Pump Trailer National Petroleum Services (NPS)

GOES DELIVERS THREE TWIN ACID PUMP TRAILER TO NATIONAL PETROLEUM SERVICES (NPS)

Recently NPS started operations with new acid pumps in Basra, Iraq.
These units are equipped with Caterpillar engines, Allison transmissions and SPM pumps. With Siemens based GOES control system and DMS (GOES Data Management System) it is an all-in-one solution for the client.
As they were the first units delivered to NPS, we maintained close contact with NPS’s operation team to make sure that all their requirements were integrated into the units and our products meet their expectations.
GOES provides in-house and on-site training for our customers.
For more information about NPS’s operations, please visit the NPS website (NESR).
Twin_acid_pumping_trailer_unit_2016_GOES

Copyright © GOES GmbH 2021

Twin_Cementing_Trailer_Irak_GOES

Twin Cementing Unit commisioned in Amarah, Iraq

TWIN CEMENTING UNIT COMMISIONED IN AMARAH, IRAQ

The twin cementing Trailer, with ADC, was fully tested at GOES testing facilities. The client came to an intensive 3 week training course after which a GOES service engineer commissioned this unit in Amarah, Iraq. Amarah is located between Baghdad and Basra.
The unit was delivered with a MAN pull truck, extensive HP iron and a spare parts package.
The unit is powered by three Deutz engines and built with Allison 4700 transmissions and SPM TWS 600 pumps.
We wish our client smooth operations and plenty of successful jobs with their new unit.
Twin_Cementing_Trailer_Irak_GOES

Copyright © GOES GmbH 2021

We are manufacturing cementing units for our clients.

Latest Twin Pump Cementing Trailer is ready

LATEST DOUBLE PUMP CEMENTING TRAILER IS READY

TWIN CEMENTING UNIT

A fully CE certified trailer mounted double pump cementing unit is ready for delivery at GOES facility in Wesendorf, Germany.
This unit is designed and manufactured for European oilfields and fully road legal in Europe. It is equipped with two TIER 4 deck engines, which are also used to run the hydraulics to save weight and costs.
The cementing unit is equipped with a recirculating cement mixing system, cement density control system, air-conditioned operator cabin and a displacement tank. The unit can be operated from the control panel, which includes all pneumatic, electrical and hydraulic controls and instrumentations for complete operations, either in automatic or manual mode.
We are manufacturing cementing units for our clients.

Copyright © GOES GmbH 2021