Wireline Logging Unit

Wireline Logging Truck Unit delivered to Poland!

WIRELINE HYBRID TRUCK UNIT
Today, GOES’ 35th Unit built by our Wireline Team from Celle, has left the yard!
That was already the second delivery in 2022!
The Wireline Logging Truck was built for Geofizyka Torun S.A. in Poland. Good Luck for our customer.
More technical details will follow during the next days.

For more information related to this type of Wireline unit, please visit the following page:

Land Units

GOES GMBH

Muenchener Strasse 32
29392 Wesendorf
Germany +49 5376 97647 – 0
+49 5376 97647 – 90
www.goes-well.com
info[at]goes-well.com

KATT GMBH

Vorbruch 6
29227 Celle
Germany +49 5141 9895 – 0
+49 5141 9895 – 60
www.katt-gmbh.com
info[at]katt-gmbh.com

Copyright © GOES GmbH 2021

Coiled_tubing_unit_6_axle_2_GOES

GOES GmbH released 6 axles truck-mounted Coiled Tubing Unit

GOES GMBH RELEASED 6 AXLE TRUCK-MOUNTED COILED TUBING UNIT

6 AXLE COILED TUBING UNIT

This summer, GOES GmbH completed its most advanced one truck Coiled tubing unit. This 6 axle coiled tubing unit is a unique design. This one truck mounted CT unit carries the complete system which consists of Coiled tubing Reel, power pack, hydraulic hose reels and injector, stripper, BOP and high pressure parts. The optimally compacted design reduced two trucks into one truck.
  • Dimensions are as per customer request (LxWxH): 15m x 2,55m x 4,5m
  • This lightweight module is equipped with a thermal insulated telescopic operator’s cabin with a hydraulic lifting system to limit the height during transportation while providing the operator a comfortable working environment with full view during operation.
  • The modified special frame and the additional axles enable the unit to carry a maximum capacity of 24 of string on the truck
    o    2”- 4700m
    o    1,75”-6200m
    o    1.5” – 8500m
Additionally, some features have been added for security and efficiency.
  • A light system is provided with one searchlight for the injector and two portable floodlights for work area lighting.
  • Installation of video surveillance system with 3 cameras, recording device and monitor.
  • Foldable walkway with safety guard for easy and safe rig-up.

Copyright © GOES GmbH 2021