Twin Cementing Pumping Unit – Trailer mounted

TWIN CEMENTING PUMPING UNIT - TRAILER MOUNTED - Delivered to Algeria

Last year at #ADIPEC we met a new customer from #North #Africa for the first time. Today, the Twin #Cementing #Pump Trailer Unit is on the way to the #Algerian #oilfields. We wish them luck and continuous jobs.
This Cementer is equipped with two C-15 engines, two #Allison 4700 transmissions and two #SPM TWS 600 pumps. The unit can be operated in automatic and manual mode.

For more information related to the Cementing Pumping Units, please visit the following page:

https://goes-well.com/oilfield-cementing-equipment
Twin cementing pump trailer

GOES GMBH

Muenchener Strasse 32
29392 Wesendorf
Germany +49 5376 97647 – 0
+49 5376 97647 – 90
www.goes-well.com
info[at]goes-well.com

KATT GMBH

Vorbruch 6
29227 Celle
Germany +49 5141 9895 – 0
+49 5141 9895 – 60
www.katt-gmbh.com
info[at]katt-gmbh.com

Copyright © GOES GmbH 2021

We are manufacturing cementing units for our clients.

Latest Twin Pump Cementing Trailer is ready

LATEST DOUBLE PUMP CEMENTING TRAILER IS READY

TWIN CEMENTING UNIT

A fully CE certified trailer mounted double pump cementing unit is ready for delivery at GOES facility in Wesendorf, Germany.
This unit is designed and manufactured for European oilfields and fully road legal in Europe. It is equipped with two TIER 4 deck engines, which are also used to run the hydraulics to save weight and costs.
The cementing unit is equipped with a recirculating cement mixing system, cement density control system, air-conditioned operator cabin and a displacement tank. The unit can be operated from the control panel, which includes all pneumatic, electrical and hydraulic controls and instrumentations for complete operations, either in automatic or manual mode.
We are manufacturing cementing units for our clients.

Copyright © GOES GmbH 2021