Coiled_tubing_fleet_2_GOES

Coiled Tubing Unit – Package 2020

COILED TUBING UNIT - PACKAGE 2020

COILED TUBING EQUIPMENT

This week GOES is shipping a Coiled Tubing Package for a valued customer to Oman. The package consists of one Coiled Tubing Unit, one Twin Pump, one 180k N2 Unit, one Batch Mixer and one Yard Spooler.
The CTU is dressed for 2“ operations and comes with a Coil Solution 80k Injector and a NEXUS 4 1/16“ BOP. All main units are equipped with Prime DMS and are suitable for desert operations.

KATT GMBH

Vorbruch 6
29227 Celle
Germany +49 5141 9895 – 0
+49 5141 9895 – 60
www.katt-gmbh.com
info[at]katt-gmbh.com

GOES_Adipec_2020

GOES GmbH is participating at ADIPEC 2019

GOES IS PARTICIPATING AT ADIPEC

ADIPEC 2019

GOES will be participating at The Abu Dhabi International Petroleum Exhibition and Conference (ADIPEC)
Abu Dhabi, UAE
November 11-14, 2019
Stand 8736, Hall 8 (German Pavilion).

Copyright © GOES GmbH 2021

GOES IGC-2019

GOES GmbH is participating at IGC Turkey 2019

GOES IS PARTICIPATING AT IGC 2019

IGC 2019

GOES will be participating at the IGC in Turkey.
Visit us at the International Geothermal Congress!
November 6-8, 2019

Copyright © GOES GmbH 2021

Wireline_unit_truck_GOES

Wireline Logging Unit delivered

WIRELINE LOGGING UNIT DELIVERED

GOES WIRELINE LOGGING UNIT

Wireline Logging Unit mounted on Mercedes Actros started today its journey to Moscow´s NEFTEGAZ 2019 for being presented to our valued customers and all interested visitors!
The unit comes with a AM5K Benchmark measuring head, Stimline XOS controls and IDEX software. We will also present a Truck Mounted Frac Pump and a NEXUS BOP. We are looking forward to meeting you there!

Copyright © GOES GmbH 2021

Twin_acid_pumping_trailer_unit_2018_GOES

Twin Pumping Unit – Ready to go / Available for sale (UPDATE : SOLD)

TWIN PUMPING UNIT - READY TO GO / AVAILABLE FOR SALE (UPDATE : SOLD)

The Twin Pump Unit (trailed mounted), which is made for desert conditions (+55 deg C), is equipped with two C15 engines, two Allison 4700 transmissions and two SPM TWS600 pumps.
It comes also with a stainless steel displacement tank, Gardner Denver c-pumps, pipe and swivel racks, air conditioned operator cabin and GOES/Prime DMS (Data Acquisition System). The offering is subject to prior sale.
For more information (full technical specification, please contact us.

Copyright © GOES GmbH 2021

Coiled_tubing_unit_2018_GOES

Coiled Tubing Unit for Ukraine

COILED TUBING UNIT FOR UKRAINE

This truck mounted Coiled Tubing Unit (Mercedes Benz 4141 8×8) is ready to go to work in Ukraine. It comes with a Coiled Tubing reel which is capable to carry up to 7.000m of 1,5″ CT string and GOES/Prime DMS.
For quick rig-up and rig-down, NEXUS stripper is directly mounted at the CSI 80k injector. NEXUS BOP and Lubricators are also mounted directly on the unit.
Operators will love it as from inside the cabin the unit looks even better. Transport height is 4m, width is 2,55m and length is 13,5m.
Coiled_tubing_unit_2018_GOES

Copyright © GOES GmbH 2021

Nitrogen_pumping_truck_2018_GOES_Oilfield_Industry_Equipment

Nitrogen Unit with Arctic Kit

NITROGEN UNIT WITH ARCTIC KIT

Truck mounted 180k N2 Pumping Unit delivered with 3.000 gal tank.
This unit is equipped with Arctic Kit, Operator Cabin, pipe racks and GOES/Prime DMS and it was built in accordance with European road regulations (12m long, 2,55m wide and 4m high). 
Nitrogen_pumping_truck_2018_GOES_Oilfield_Industry_Equipment

Copyright © GOES GmbH 2021

Twin_acid_pumping_trailer_unit_2017_GOES

Twin Pumping Units for National Petroleum Services (NPS)

GOES GMBH DELIVERS EQUIPMENT FOR TACROM SERVICES

Recently GOES delivered another Twin Pumping unit to its valued customer, National Petroleum Services (NPS). The unit comes with 2 C-15 engines, 2 Allison 4700 transmissions and 2 SPM TWS 600s HD pumps.
The unit is equipped with stainless steel displacement tanks and GOES DMS (our state-of-the-art Data Acquisition Software) for its work in Basra, Iraq. We also deliver two more DMS sets to upgrade 2 other NPS Twin Pumps.
We are glad to have NPS as a repeated customer. These sales are the best feedback when it comes to quality work and good after-sales service.
Twin_acid_pumping_trailer_unit_2017_GOES

Copyright © GOES GmbH 2021

Coiled_tubing_trailer_2017_GOES

Coiled Tubing Unit for Geothermal Wells

COILED TUBING UNIT FOR GEOTHERMAL WELLS

Last week this Coiled Tubing Unit decided to leave the rainy German autumn weather to go into sunny Turkey to stimulate some Geothermal wells.
GOES delivered this unit which holds 5.000m of 2“ pipe together with a nitrogen unit, a yard spooler, a package of high temperature downhole tools, a set of HP-piping and spare parts.
This GOES CT unit is equipped with a high-temperature NEXUS BOP & Stripper and a Coil Solutions injector.
Coiled_tubing_trailer_2017_GOES

Copyright © GOES GmbH 2021

Frac_pump_1_2017_GOES

June – Month of the Frac Pumps

JUNE - MONTH OF THE FRAC PUMPS

FRAC PUMPING UNIT 

June 2017 was the month of the frac pumps at GOES GmbH. Several units tested with our clients and have been shipped/ get ready for shipment.
Various configurations : MTU engines, Caterpillar engines as well as Caterpillar, Allison and ZF transmissions.
All designs are in place for truck, trailer and skid mounted needs.

Copyright © GOES GmbH 2021