Wireline Mast Refurbishment made in Europe

Wireline mast refurbisment

WIRELINE MAST REFURBISHMENT

During the last weeks, our team in Celle made a major overhaul and recertification of an Elmar 80 ft #wireline Mast.
These major overhaul included following main steps:
 
–  Disassembly of the entire mast and substructure
–  Sandblasting of the main components
–  Nondestructive welding inspection
–  Welding repairs, where required
–  #Offshore frame overload lifting test, witnessed by third party
–  Coating
–  Assembly
–  Replacement of all hydraulic hoses and damaged components
–  Replacement of ropes, sheaves, lifting set and guy wires plus tirfors
–  Mast and #winch overload tests witnessed by third party
–  Third party certificate for Offshore Containers according ISO 10855
–  Third party certificate of test and thorough examination of Lifting Appliances
 
Last week the Wireline Mast was transported to our Client, InWaTec Combined B.V. in Emmen. On Wednesday, our training team taught 16 operators from InWaTec B.V. to operate this mast.
 
Thanks a lot to #InWaTec B.V. for this project, and we wish always safe jobs with this beauty!

#wireline #oilandgas #oilandgasindustry #oilfield #oilfieldservices

For more information related to the Wireline units, please visit the following page:

Wireline Units

Copyright © GOES GmbH 2021

Wireline Crane Truck - Dual drum Slickline and Wireline winch

Wireline Crane Unit – Ready to go!

WIRELINE CRANE TRUCK UNIT READY TO GO!
A new member of the GOES’ Slickline and Wireline Family is ready for shipment.
Our team in Celle finished has just finished to build a power pack driven Wireline crane truck with final destination in Middle East.
FEATURES
  • Dual drum Slickline and Wireline winch (slickline and cased hole logging combi winch)
  • Closed loop hydraulic winch drive by Diesel power pack
  • 20“ counter head with hydraulic load cell
  • Digital winch operator panel with job data logger
  • Digital BU depth panel
  • Power pack status panel
  • Integrated PCE control panel
  • Integrated grease injection unit with screw-type high volume compressor
  • +60° C heavy duty Air Condition (hydraulic drive)
  • Manitex 26 USton telescope crane with 101 ft boom
  • Mercedes Arocs 8 x 4 truck chassis with 360 HP
The dual drum wireline winch with 20” counter head and the integrated crane are powered by a rig safe 136 hp Caterpillar diesel engine with overspeed shut down, spark arrestor, anti-static fan and  belts and a gas detector on the air intake.
The truck has an integrated pressure control equipment hydraulic panel and grease pumps with a high volume screw type compressor for Braided and E-Line operations. PCE pressure tests can be performed with a high-pressure test unit with an 1.000 l stainless steel tank.

Copyright © GOES GmbH 2021