Coiled_tubing_Frac-Pumper_neftegaz_2016_GOES

GOES GmbH will attend NEFTEGAZ Exhibition

GOES GMBH WILL ATTEND NEFTEGAZ EXHIBITION

GOES GmbH will attend the Neftegaz exhibition, Moscow, Russia, from April 18th to 21th, 2016. We herewith kindly invite you to our booth 6-50 (outdoor area) for a chat, Ratzeputz or a German sausage.
We will exhibit the following two units:
1. Coiled Tubing Unit
Mounted on Mercedes Chassis, reel capacity of 6.200m of 1.5” string,      80k Coil Solutions injector, 3 1/16” Nexus BOP, Medco DAS.
2. Frac Pump Truck
MTU 12V4000S83 engine, Allison 9823 transmission, SPM TWS 2250 triplex pump.
Both units are available for sale and come with all required paperwork for Russian road registration and arctic package.
Please contact for more information info [a] goes-well.com
Photos: Units at GOES facility prior to leaving for Moscow
Coiled_tubing_Frac-Pumper_neftegaz_2016_GOES

Copyright © GOES GmbH 2021

GOES_Welding-Facility-2015

GOES GmbH increases manufacturing capacity

GOES GMBH INCREASES MANUFACTURING CAPACITY

MANUFACTURING CAPACITY

In March 2015 GOES GmbH constructed a new welding facility to increase manufacturing capacity.
Benefits of the additional 1.200 square meter facility to the assembling process include:
  • Shorter distances between part storage and assembly line, leading to quicker production processes
  • Higher Quality Assurance, due to separation of the welding process
  • Improved HSE standards especially with the new state of the art extraction unit at each work place
GOES_Welding-Facility-2015

Copyright © GOES GmbH 2021